Amper expansion for electric car charging

What to do in case of an amp expansion? We can help!

Voltie editorial teamUpdated: November 23, 2026
Hand holding a multimeter at an electrical panel during installation

If we install a new electricity consumer and the network without inspection, it will overload; in the best case, the circuit breaker will cut off the power, but in the worst case - if the circuit breakers do not work - a fire can arise due to heat generation. Therefore, if experts assess that an ampere increase will be necessary, we should definitely heed their advice.

The ampere increase actually means increasing the strength of the current so that more devices can be operated at the same time.

Voltage charger in the garage

How much is that?

The price of the expansion is influenced by many factors, making it difficult to determine the costs precisely. 

  • The bigger the amperage expansion the customer wants, the more materials and labor hours will be needed. 

  • The pricing is different for an outdated electrical system that needs a complete renovation than for a newly installed network.

  • It matters in the pricing how complicated the work is, as well as how many special tools and techniques are required.

In general, the price for amperage expansion can range from tens of thousands to several hundred thousand, and it is important to request an accurate quote before anyone starts the expansion. 

Since the power expansion can involve serious risks, only registered electricians who are authorized for breaking seals can perform it. When requesting a quote, it is worth ensuring that it includes material and labor costs, other expenses, guarantee, and future maintenance services as well. Because unexpected costs may arise during the expansion, it is advisable to budget 10-20% more than the quote itself.

Before upgrading, look at Dynamic Load Management: it adjusts the charging power to the other consumers in your home, so your existing connection may be enough.

The amper extension process

On-site survey: 
An on-site survey is required to determine the appropriate performance, where not only is it checked whether the current consumption can be handled by the network, but also the planned expansions are taken into account. If necessary, the specialist will help us choose the most suitable amper extension for us.

Application form:
An application form must be submitted to the service provider in case of amper extension. This will require the last paid bill, the property identification number, the applicant's information, and a power of attorney must also be attached for the entire administration, as our contractor will submit the form. It is important that the application form accurately contains the information related to the modifications! (For example, the order, performance, and connection method changes of the phases).

Sending the Technical Economic Information:
Upon a correctly filled out application form, the service provider will send back the Technical Economic Information, which will detail what modifications need to be made at the metering location. Additionally, the charges for additional services will be indicated here.

Establishment of a standard metering point:
The contractor must establish the necessary metering point based on the Technical Economic Information (GTM), and then they must notify the service provider of the completed work.

Installation of a new meter:
After reporting the completed work, the service provider's appointed personnel will install the new meter and circuit breakers.

Final connection to the network:
If the service provider's qualified technicians are tasked with the job, electricity needs to be temporarily cut off only during the installation, as they can reconnect the network until the service provider completes the final connection.

Step

What happens?

1. On-site survey

the specialist assesses the current and the planned load

2. Application form

the contractor submits it to the service provider with a power of attorney

3. Technical and economic information letter

the service provider describes the tasks and the fee

4. Metering point

the contractor brings it up to standard and notifies the service provider

5. New meter

the service provider installs the meter and the circuit breakers

6. Final connection

the service provider permanently connects it to the grid

Where can I find a reliable specialist?
If you would like to find a reliable and professional electrician based on a recommendation, feel free to contact us, we can help! You can reach our sales manager, Egressy András, at the egressy.andras@voltie.eu email address, or at the +36 20 275 3395 phone number.

Frequently asked questions

From a few tens of thousands of forints to several hundred thousand, depending on the size of the upgrade and the condition of the supply. Ask for an exact quote and allow a 10-20% reserve.

Only a registered electrician who is authorised to break the meter seal.

The last paid bill, the land registry number of the property, the applicant's details and an authorisation for the contractor.

Often, yes. With Dynamic Load Management the charger charges only with the free capacity, so it does not exceed the main fuse. This requires an external smart meter.

Would you like a quote for your charger?

Request a quote

Request a quote

Request a quote

Request for quote

!

In case of technical questions or reporting a bug, please contact us on the following email address: help@voltie.eu

!

If you are interested in our solution, please fill out the following form. Soon we will send you a personalized offer. Thank you!

András Egressy, Head of Sales

ANDRÁS EGRESSY

Head of Sales (HUN)

Gábor Kozák, Head of International Sales

GÁBOR KOZÁK

Head of International Sales

Zoltán Magyar, Sales Manager

Zoltán Magyar

Sales Manager

Bence Tóth, Key Account Manager

BENCE TÓTH

Key Account Manager

Mátyás Wolf, Account Manager

MÁTYÁS WOLF

Account Manager

Request for quote

!

In case of technical questions or reporting a bug, please contact us on the following email address: help@voltie.eu

!

If you are interested in our solution, please fill out the following form. Soon we will send you a personalized offer. Thank you!

András Egressy, Head of Sales

ANDRÁS EGRESSY

Head of Sales (HUN)

Gábor Kozák, Head of International Sales

GÁBOR KOZÁK

Head of International Sales

Zoltán Magyar, Sales Manager

Zoltán Magyar

Sales Manager

Bence Tóth, Key Account Manager

BENCE TÓTH

Key Account Manager

Mátyás Wolf, Account Manager

MÁTYÁS WOLF

Account Manager

Request for quote

!

In case of technical questions or reporting a bug, please contact us on the following email address: help@voltie.eu

!

If you are interested in our solution, please fill out the following form. Soon we will send you a personalized offer. Thank you!

András Egressy, Head of Sales

ANDRÁS EGRESSY

Head of Sales (HUN)

Gábor Kozák, Head of International Sales

GÁBOR KOZÁK

Head of International Sales

Zoltán Magyar, Sales Manager

Zoltán Magyar

Sales Manager

Bence Tóth, Key Account Manager

BENCE TÓTH

Key Account Manager

Mátyás Wolf, Account Manager

MÁTYÁS WOLF

Account Manager

Voltie
1027 Budapest, Henger Street 2. C Building
info@voltie.eu
Subscribe to our newsletter
© 2026 - Voltie Kft.
Voltie
1027 Budapest, Henger Street 2. C Building
info@voltie.eu
Subscribe to our newsletter
© 2026 - Voltie Kft.
Voltie
1027 Budapest, Henger Street 2. C Building
info@voltie.eu
Subscribe to our newsletter
© 2026 - Voltie Kft.